project highlights
Services provided
Aquatics
Year completed
2017
features
Warm-Up Pool, Lap Pool
pool area
7,500 SF
St. Augustine Prep Academy School
Milwaukee, WI
Located on the south side of Milwaukee, St. Augustine Prep Academy desired an elite, regulation-sized competition pool. Ramaker designed and engineered an aquatic facility that includes a 25-yard x 25-meter competition pool as well as a warm-up/lesson pool. This facility’s standout feature is that the competition pool was designed with flexible training programs in mind. The pools are equipped with the latest technology, including regenerative filters and UV disinfection systems.