project highlights

Services provided

Aquatics

Year completed

2017

features

Warm-Up Pool, Lap Pool

pool area

7,500 SF

St. Augustine Prep Academy School

Milwaukee, WI

Located on the south side of Milwaukee, St. Augustine Prep Academy desired an elite, regulation-sized competition pool. Ramaker designed and engineered an aquatic facility that includes a 25-yard x 25-meter competition pool as well as a warm-up/lesson pool. This facility’s standout feature is that the competition pool was designed with flexible training programs in mind. The pools are equipped with the latest technology, including regenerative filters and UV disinfection systems.

Related Projects