project highlights
services provided
Aquatics, MEP
year completed
2011
AREA
40,000 SF
COST
$24,000,000
This indoor waterpark at Jay Peak Resort utilizes the latest technologies for energy efficiency, including a translucent OpenAire building structural system and a shared heating system between the waterpark and hotel. Exciting features include the first indoor AquaLoop in the United States, a swimming hole with a climbing wall, two tube slides, one body slide, a wading pool with multi-level play feature and a surf feature! For those looking to relax, there is a large lazy river, indoor and outdoor spas, and an outdoor lounging pool.